PT. Packaging Indonesia: Produsen Gelas Plastik di dalam Pabrik Customer (In-Plant) AMDK di Nusa Tenggara Barat

Tanurahardja, Lucy and Yudi, Yudi and Budi, Budi and Rosidi, Mohamad and Santoso, Louis T. (2021) PT. Packaging Indonesia: Produsen Gelas Plastik di dalam Pabrik Customer (In-Plant) AMDK di Nusa Tenggara Barat. Masters thesis, Universitas Prasetiya Mulya.

[thumbnail of 01. COVER.pdf] Text
01. COVER.pdf - Cover Image

Download (700kB)
[thumbnail of 02. LEMBAR PERNYATAAN.pdf] Text
02. LEMBAR PERNYATAAN.pdf - Published Version
Restricted to Repository staff only

Download (321kB) | Request a copy
[thumbnail of 03. LEMBAR PERSETUJUAN.pdf] Text
03. LEMBAR PERSETUJUAN.pdf - Published Version
Restricted to Repository staff only

Download (344kB) | Request a copy
[thumbnail of 04. KATA PENGANTAR.pdf] Text
04. KATA PENGANTAR.pdf - Published Version
Restricted to Repository staff only

Download (681kB) | Request a copy
[thumbnail of 05. ABSTRAK.pdf] Text
05. ABSTRAK.pdf - Published Version

Download (679kB)
[thumbnail of 06. DAFTAR ISI.pdf] Text
06. DAFTAR ISI.pdf - Published Version
Restricted to Registered users only

Download (786kB) | Request a copy
[thumbnail of 07. BAB 1.pdf] Text
07. BAB 1.pdf - Published Version
Restricted to Registered users only

Download (763kB) | Request a copy
[thumbnail of 08. BAB 2.pdf] Text
08. BAB 2.pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of 09. BAB 3.pdf] Text
09. BAB 3.pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of 10. BAB 4.pdf] Text
10. BAB 4.pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of 11. BAB 5.pdf] Text
11. BAB 5.pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of 12. BAB 6.pdf] Text
12. BAB 6.pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of 13. BAB 7.pdf] Text
13. BAB 7.pdf - Published Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of 14. BAB 8.pdf] Text
14. BAB 8.pdf - Published Version
Restricted to Registered users only

Download (2MB) | Request a copy
[thumbnail of 15. DAFTAR PUSTAKA.pdf] Text
15. DAFTAR PUSTAKA.pdf - Published Version
Restricted to Registered users only

Download (681kB) | Request a copy
[thumbnail of 16. LAMPIRAN.pdf] Text
16. LAMPIRAN.pdf - Published Version
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

Indonesians use mineral water in plastic cup for daily consumption, events and for welcoming guest at home. Demand for mineral water in plastic cup, nationally is 4% growth per year, with around 5-10% growth in Nusa Tenggara Barat (NTB). With this growth percentage, supply of plastic cup is needed accordingly. While mineral water producers are distributed in all islands in Indonesia, plastic cup manufacturers are located in Java and Sumatera. This situation causes all mineral water producers located outside of those islands to source their material from either Java or Sumatera. In the case of NTB, the producers need to source their plastic cup from East Java. Based on our initial survey and later followed up by interviews with mineral water producers in NTB and plastic cup manufacturer in East Java, we see a huge opportunity to establish a plastic cup manufacturing facility in NTB, to solve customers’ job to be done. By producing locally, we will be able to reduce Delivery Leadtime from 14 days to 1 day, reduce packaging inventory at client from 1 month to 1 day, reduce quality risk due to delivery from 3% to 0%, and give lower cost as the additional benefit. To achieve this objective, and to ensure existing suppliers not able to cut our business, we have decided to introduce a new business model: In-Plant Manufacturing; by putting our plastic cup machine inside our customer factory, with a long-term supply agreement. In-Plant manufacturing is our core value-chain, where we combine: Inbound Logistic, Production, and Outbound Logistic in one location, at our customer factory. Based on the economic situation and financial assumption, we have calculated the financial projection from all variables and our expected payback period is in 4.28 years. The feasibility calculation also results in IRR of 23.41%. In summary, this business idea is feasible and promising for investor and customers since PT. Packaging Indonesia provides a win-win solution for local people in terms of income and to the government.

Item Type: Thesis (Masters)
Uncontrolled Keywords: In-Plant Manufacturing, Plastic Cup Manufacturing, Supply Chain Optimization, Local Production Strategy, Financial Feasibility Analysis
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HG Finance
Divisions: School of Business and Economics > S2 Strategic Management
Depositing User: Librarian 04 at Universitas Prasetiya Mulya
Date Deposited: 02 Mar 2026 10:40
Last Modified: 02 Mar 2026 10:40
URI: https://elib.prasetiyamulya.ac.id/id/eprint/1027

Actions (login required)

View Item
View Item