INTO-IN: Peer to Nation for Renewable Power Plant

Yuliana, Catherina and Margareta, Margareta and Nasution, Putri Rahmi Yuli and Alvin, Reinaldi and Herubowo, Yudhistira (2015) INTO-IN: Peer to Nation for Renewable Power Plant. Masters thesis, Universitas Prasetiya Mulya.

[thumbnail of 01. COVER.pdf] Text
01. COVER.pdf - Cover Image

Download (175kB)
[thumbnail of 02. LEMBAR PERNYATAAN.pdf] Text
02. LEMBAR PERNYATAAN.pdf - Published Version
Restricted to Repository staff only

Download (2MB) | Request a copy
[thumbnail of 03. LEMBAR PERSETUJUAN.pdf] Text
03. LEMBAR PERSETUJUAN.pdf - Published Version
Restricted to Repository staff only

Download (3MB) | Request a copy
[thumbnail of 04. KATA PENGANTAR.pdf] Text
04. KATA PENGANTAR.pdf - Published Version
Restricted to Repository staff only

Download (241kB) | Request a copy
[thumbnail of 05. ABSTRAK.pdf] Text
05. ABSTRAK.pdf - Published Version

Download (250kB)
[thumbnail of 06. DAFTAR ISI.pdf] Text
06. DAFTAR ISI.pdf - Published Version
Restricted to Repository staff only

Download (733kB) | Request a copy
[thumbnail of 07. BAB 1.pdf] Text
07. BAB 1.pdf - Published Version
Restricted to Repository staff only

Download (348kB) | Request a copy
[thumbnail of 08. BAB 2.pdf] Text
08. BAB 2.pdf - Published Version
Restricted to Repository staff only

Download (517kB) | Request a copy
[thumbnail of 09. BAB 3.pdf] Text
09. BAB 3.pdf - Published Version
Restricted to Repository staff only

Download (418kB) | Request a copy
[thumbnail of 10. BAB 4.pdf] Text
10. BAB 4.pdf - Published Version
Restricted to Repository staff only

Download (790kB) | Request a copy
[thumbnail of 11. BAB 5.pdf] Text
11. BAB 5.pdf - Published Version
Restricted to Repository staff only

Download (630kB) | Request a copy
[thumbnail of 12. BAB 6.pdf] Text
12. BAB 6.pdf - Published Version
Restricted to Repository staff only

Download (752kB) | Request a copy
[thumbnail of 13. BAB 7.pdf] Text
13. BAB 7.pdf - Published Version
Restricted to Repository staff only

Download (407kB) | Request a copy
[thumbnail of 14. BAB 8.pdf] Text
14. BAB 8.pdf - Published Version
Restricted to Repository staff only

Download (902kB) | Request a copy
[thumbnail of 15. BAB 9.pdf] Text
15. BAB 9.pdf - Published Version
Restricted to Repository staff only

Download (259kB) | Request a copy
[thumbnail of 16. DAFTAR PUSTAKA.pdf] Text
16. DAFTAR PUSTAKA.pdf - Published Version
Restricted to Repository staff only

Download (87kB) | Request a copy
[thumbnail of 17. LAMPIRAN.pdf] Text
17. LAMPIRAN.pdf - Published Version
Restricted to Repository staff only

Download (5MB) | Request a copy

Abstract

Energy acts as a facilitator to the country’s increasing economic and population growth, with a forecasted more than 50% rise of demand by 2050 (RUPTL, 2017). To facilitate growth, Indonesia is targeting an estimated IDR 1.400 trillions of renewable power plant investment. The funds required to fulfill by private investment is IDR 1.120 trillions by 2025 (BKPM, 2016). Based on the Indonesia government regulation Number 79 year 2014, RUKN 2016, The Kyoto Protocol, and Paris Climate Agreement: the contribution of clean energy in Indonesia’s power plant energy mix is expected to reach 25% in 2025. However, the current condition is only 15.9% (BP, 2018). INTO-IN aims to close the gap by 2-3% by 2025. INTO-IN is the pioneer in (Peer-to-Nation) P2N* fintech lending that solves private contractors’ financial constraints. INTO-IN accelerates infrastructure projects with the mission to drive the nation’s growth and helps Indonesia achieve Sustainable Development Goals (SDGs). The model is set by funding renewable energy power plants executed by Independent Power Producers. INTO-IN provides financing for IPPs (Independent Power Producers) that already signed Power Purchase Agreement (PPA) with PLN and in the process of seeking funds. PPA guarantees that PLN will buy electricity produced by IPPs for 20 30 years. The IPPs will be evaluated based on performance and credibility to protect the funds from the risk of incomplete projects. The interest rate imposed on the IPP will be 14-16% based on their performance. Each 1 MW generating capacity micro hydro/hydro power plant will cost around IDR 36 billion, where INTO-IN aim to fund 70% of the total cost of IDR 25,2 billion. In the end of 2024 INTO-IN will have a total of 30 projects worth of IDR 756 billion. In the beginning, INTO-IN is looking for IDR 40 billions from Venture Capital as a seed funding. INTO-IN offers an investment product with social aspects and flexibility as it main differentiation to lenders across Indonesia. To fulfill the needs of flexible investment products, INTO-IN offers a withdrawal feature, with a minimum investment of IDR 1.000,000 and an expected RoR from 8-9% per year based on the projects with self-assign system. The flexible feature allows lenders to withdraw their funds anytime with certain terms and condition. By the fifth year, INTO-IN will generate a positive net profit of IDR 2,4 billion and by 2027, net profit will reach IDR 48,7 billion. INTO-IN have an estimated NPV of IDR 224 billion based on the valuation using going concern assumption.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Clean Energy Mix, Independent Power Producer (IPP), Infrastructure Fintech Lending, Peer-to-Nation (P2N) Model, Power Purchase Agreement (PPA), Renewable Energy Investment
Subjects: H Social Sciences > HG Finance
Divisions: School of Business and Economics > S2 Business Management
Depositing User: Librarian 04 at Universitas Prasetiya Mulya
Date Deposited: 08 Apr 2026 14:02
Last Modified: 08 Apr 2026 14:02
URI: https://elib.prasetiyamulya.ac.id/id/eprint/1841

Actions (login required)

View Item
View Item